Category Archives: On-going projects

Water tower (2014)

The old water tower (1977) at Rubya hospital

The old water tower (1977) at Rubya hospital

As from 2013 there are problems with a leaking water tank of nearly 40 years old, creating a fresh water shortage in the hospital. Back in 1977 a bore hole was drilled at 100 meters deep, which is still functioning. We plan to erect a new steel frame on top of which four 10,000 litre tanks will be placed.
Continue reading

RCH Clinic (2014-2015)

The new RCH Clinic being builtThe Reproductive Child Health Clinic is a daily clinic for antenatal care, postnatal care, vaccinations and health care for children under 5 years of age. Health education on proper food, hygiene and malaria prevention is also given here.

The structure of the building is on the brink of collapse and is in fact beyond repair. It is in need of reconstruction.
Continue reading